We ship to the Philippines — door-to-door, customs and logistics handled by 3G Electric

Image not available
CBMAccessories & Installation

CBM System cleaning pump 30 L EURPRSPN

CBM system cleaning pump delivers 5400 l/hr flow at 2 bar maximum pressure with 30 L capacity for industrial cleaning and descaling applications. The 0.25 kW power consumption makes it suitable for facility…

SKU 3G-CBM-01943

Also listed as: DET 10010 · DET-10010

Brand
CBM
Item
System cleaning pump 30 L EURPRSPN
Category
Accessories & Installation
UNSPSC
47131821 — Degreasing compounds
Available to Order
Trade pricing by quote — replies within 24h
Qty
WhatsApp an engineerMessage via Telegram
No account needed — your quote request goes straight to our engineers. A free account lets you track quotes and re-order faster.
Worldwide Shipping
Air & sea freight
Datasheet on Request
Technical specs
1-Day Quote
Replies within 24h

Local availability & support — the Philippines

Delivery
5–8 business days door-to-door; Bureau of Customs clearance typically 2–4 business days.
Payment
Invoicing in PHP or USD. Bank transfer and corporate PO accepted.
Ships to
Manila, Quezon City, Cebu, Davao, Batangas

Technical Specifications

CBM
flow rate
5400 l/hr
max pressure
2 bar
capacity liters
30
max working head
2 bar
power consumption
0.25 kw

Datasheet Content

EUROMAX FLUSH User Manual & Instructions EXPLODED VIEW DIAGRAMMATIC PARTS LIST 1 Metal chassis 9 Brass 3/4” niples with o-ring 2 Spacers 10 Protecting metal plate 3 Dump-T-tube with 3/4” swivels 4 11 Screws for protecting metal Right connecting tube with swivels 5 plate Left connecting tube with swivels 6 12 Fixing nut for dump-T-tube Right 3 ways valve 13 3/4” PP niples with o-ring 7 Left 3 ways valve 14 3/4” 3 ways valve 8 Rubber gasket ø 24 (o-ring ø 24) 15 Elbow fitting with o-ring CONTENTS 1 New EUROMAX FLUSH pump 1 Carry bag with shoulder strap 2 3m of 3/4” reinforced hose with swivel couplings 1 special funnel to assist filling tank 1 bag selection of various fittings to facilitate connection to heating systems SPECIFICATION Dimensions: 65 cms x 56 cms x 37cms Weight: 13 kilos Capacity: 37 liters Flow rate: 5,400 ltrs/hr max Power consumption: 0,25 kw Max working head: 2 bar Incorporated multifunction isolation/dump valves protective plate. The todays tools NEW EUROMAX FLUSH pump may be used with any proprietary brand of descaling and flushing chemicals on the market and is able to operate easily to a maximum head of 2 bar and efficiently clean up to 20 radiators. Working fluid temperature up to 50°C-55°C. PREPARATION Initially start the heating system to ascertain the problem ares. Once estabilished switch the heating system off. Open all restrictive radiator & zone valves. Turn off the cold feed to the expansion tank and drain the tank sufflienty to loop together the feed & expansion pipes incorporating a gate valve. This loop will ensure total circulation when the NEW EUROMAX FLUSH pump is applied. Draining the expansion tank can be undertaken either by conventional means or connecting the flushing pump into the system & draining the expansion tank until the pump tank is approx 1/3-3/4 full which should be sufficient to drain the tank and allow the loop to be fitted. NB - The pump motor must not be operating during this process. POSITION Generally the NEW EUROMAX FLUSH pump should be situated in an area with acces to a cold feed supply & drain facility. A kitchen or utilty room usually being ideal. All debris will now be flushed through the filter cleaning the coil and draining off via the drain valve. When all the debris is removed then reverse the cleaning procedure, ensuring that the dump valve is closed and the magnet reinserted into its position. Ensure that all dirty water dumped in the procedure is replaced with clean. ASSEMBLY overflow water inlet tap Using the female swivel fittings, screw the two lengths of hose provided to the “flow” and “return” 3/4” mi threads as clearly indicated in the centre at the base of the protection plate, fitted to the rear of the NEW EUROMAX FLUSH pump. Supply three own hoses, and with the protection plate facing towards you connect as follows:- 1. Clean cold water supply to the water inlet tap situated on the tank top, as indicated on the bottom left of the protection plate. 2. Connect to 3/4” mi joint valve dump outlet situated on the top of the protection plate, and route direct to drain. 3. Connect to the flushing tank overflow situated on the L/H side of the tank as indicated on the protection plate and route directly to the drain. ALL FITMENT POSITIONS ARE CLEARLY INDICATED ON THE PROTECTION PLATE The pump is supplied with various adaptors to facilitate system connection at the point most suitable for each individual system ie radiators or boiler. THE INITIAL FLUSH AND OPERATION NOTE: - If the pump was used to drain the expansion tank/system, first remove the dirty water prior to replenishing the tank approx 1/3rd with cold clean water via the inlet tap as previously mentioned. With the system drained and the tank approx 1/3 rd full off clean water the system is now ready for the initial flush. Ensure the pump isolation valves fitted on the protection plate are pointed in the “recirculate” position. After checking that any obstructing valves are fully open on the whole system, including the newly installed gate valve on the F&E loop, start the pump for approx 10-15 mins in a forward direction. After this period reverse the flow again for 10-15 mins. Repeat this procedure several times whilst constantly monitoring the condition of the water, & maintain the water is clear. WATER FLOW ALTERNATION This is achivied by alternating the lever on the flow diverter valve to a forward or reverse position. The lever when in the correct position ”points” to the flow direction required. The flow diverter valve is situated on the top of the tank at the front, directly over the filling neck. As the water becomes dirty then dump and replace for “dumping” see dump valve section. Any commercial brand of descaler or flushing agent may now be introduced and mixed and operated according to the manufacturers instruction. NOTES 1. If an acid based descaler is used then the system including the pump must be neutralized with the suggested neutralizing agent prior to the final flush through with cold water. 2. At all times the tank filling cap must be left off in order to allow the exhaust of acidic vapor created by cleaning process. 3. Maintain vigilance on the amount of foam produced. Do not overfill the tank by exceeding the maximum level. All radiators should be individually flushed. This is achieved by closing all radiators except the one being worked on. Radiators should be initially flushed individually with clean water. Alternating the flow direction as previously described and prior to repeating the process with the appropriate chemical additive. DUMP VALVES Both flow and return pipes are fitted with single - 3 position valves. IE:- Dump - Closed - Recirculate Each position for each valve lever is clearly indicated on the protection plate: DUMP VERTICAL UPWARD CLOSED HORIZONTAL RECIRCULATE VERTICAL DOWNWARD This system allows dirty water to be expelled when flowing in either direction. As previously mentioned, the flow reverse lever, when in position, “points” from bottom to top indicating the direction of flow. To dump the water, first establish the flow direction by checking the position on the lever. Having established this, then adjust the three position valve situated at the farthest point of flow from “recirculate” to “dump”. The pump will now start to dump the dirty water. Having completed the dump then return the valve from ”dump” to its original “recirculate” position then replace the expelled water with clean. This procedure must be repeated alternating the valves as the flow direction is altered. Notes: 1. To circulate both valves in the “recirculate” position 2. To dump - the valve farthest from the point of flow is adjusted to the “dump” position. After completion of the cleaning process re-open all valves and thoroughly flush the system through, dumping any remaining dirty water and replacing with clean until it is clear. When the water remains clear then follow the manufacturer’s instructions for the introduction of inhibitor. On completion, test, vent, and replace all valves to original position. COMBINATION BOILERS Because of the restriction of space it is recommended that the flow and return hoses from the NEW EUROMAX FLUSH pump are connected by the radiators or by the boiler when being replaced. WARRANTY In order to maintain continued flushing pump efficiency and reliability it is of paramount importance that all equipment is thoroughly washed with clean water. 12 Months parts and labor subject to fair wear and tear and no misuse. Then manufacturer and distributor reserve the right, that in the event of a fault claim they will repair or replace accordingly at their discretion. NOTE: - These notes are for guidance only and in no way will any claims for any damages be entered into in any way whatsoever caused. EUROMAX FLUSH APPAREILS DE MESURE ET ANALYSE KITS DE TESTS POMPE DE MISE EN ÉTAT ET NETTOYAGE DU SYSTÈME Jusqu'à 20 radiateurs (2 étages) La pompe de nettoyage EUROMAX FLUSH a été conçue pour nettoyer et mettre en état rapidement l'intégralité du système de chauffage. Vient à bout des problèmes liés à la circulation des eaux, causés par l'accumulation de boues, corrosion et dépôts de calcium. Effectue un nettoyage efficace de 20 radiateurs max. Fonctionne avec une température de liquide pouvant aller jusqu'à 50°C - 55°C. Principales caractéristiques Soupapes de vidage rapide à 3 modes, équipées de goulottes de déversement en laiton, d'un diamètre de ¾” ; revêtement protecteur ; robinet 90°de remplissage d'eau ; tuyaux de raccord et entonnoir de remplissage sont intégrés dans un sac pratique avec poignée et bandoulière. Utilisation adaptée à n'importe quel produit nettoyant (acide, alcalin ou neutre). CODE CBM MODÈLE RÉSERVOIR PRESSION MAX. LITRES MAX. ÉVAL. HP DIMENSION L h cm 3G-CBM-01943 EUROMAXFLUSH 30 2,0 5400 0,45 58x45x30 PRODUITS CHIMIQUES DE NETTOYAGE p. 43-44 INSTALLATION EAU : produits, filtres et accessoires 57 Technologies et composants pour le génie climatique
Not sure this is the right part? Get a recommendation.

Need installation or engineering help?

Installation, commissioning, maintenance plans, system design, and bundled product + service quotes — one team handles the full scope.
Talk to an engineer

Ask a question

CBM Products
3G Electric (S) Pte. Ltd. — Singapore

Product Description

CBM system cleaning pump delivers 5400 l/hr flow at 2 bar maximum pressure with 30 L capacity for industrial cleaning and descaling applications. The 0.25 kW power consumption makes it suitable for facility maintenance and equipment decontamination operations.

Supplied to the Philippines — compatible with 60 Hz installations. DHL Express delivery to Manila, Quezon City, Cebu, customs and duties handled door-to-door.

Frequently Asked Questions

Where can I buy a CBM EURPRSPN cleaning pump in the Philippines?

3G Electric Philippines stocks and sources the CBM EURPRSPN 30 L system cleaning pump for delivery to Manila, Quezon City, and nationwide. We handle Bureau of Customs clearance and logistics. Contact us for availability and PHP invoicing.

What is the lead time for the CBM EURPRSPN pump?

Lead time varies based on current stock and origin logistics. 3G Electric sources from reliable suppliers and manages customs documentation for Philippines delivery. Request a quote for specific delivery timeline.

Is the CBM EURPRSPN pump suitable for food processing facility cleaning?

Yes. The CBM EURPRSPN delivers 5400 l/hr at 2 bar maximum pressure with 30 L capacity, making it ideal for industrial cleaning and equipment decontamination in food processing and packaging plants across CALABARZON.

Used in

Common applications for CBM
Industrial boilers — CBM circulation pumps (mod. CM 30W) and solenoid valves (ELV series) for heating-loop control and pump staging.
Burner systems — CBM oil nozzles (FLU atomizer types), electrodes (ELC 200 mm), and solenoid coils (ELV 230V AC) for combustion ignition and flame supervision.
Plant maintenance and retrofit — CBM cable glands (CLI M25), motor couplings (ACC type D), and small-radius fittings (RAC 90°) for equipment reconfiguration and sensor integration.
Boiler water treatment — CBM chlorine test kits (DET free+combined) for feedwater and circulating-water quality monitoring in closed-loop systems.
Pump and motor assembly — CBM couplings, fittings, and cable glands for assembly and rewinding of industrial motors, circulation pumps, and auxiliary equipment.

CBM Products

3G Electric supplies CBM accessories & installation. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.

You might also need

Burners & Combustion Pumps & Compressors Spare Parts All Products

Compatible alternatives & equivalents

Cross-referenced by specification & description
Rinsing pump EUROMAX120 EUROM120
CBM
Rinsing pump EUROMAX120 EUROM120
40 L cart pump EUROMAX FLUSHTROLLEY
CBM
40 L cart pump EUROMAX FLUSHTROLLEY
CBM
CBM
Loading and washing pump SUPERFLUK
Kit and cartridges KIT/RIVER/ADD/M KITRADDM
CBM
Kit and cartridges KIT/RIVER/ADD/M KITRADDM
CBM
CBM
Kit and cartridges KIT/RIVER/DEMI/L KITRDEML
CBM
CBM
Kit and cartridges KIT/RIVER/DEMI/M KITRDEMM

More from CBM

View all CBM parts
CBM
CBM
PH calibration solution 25 sachets of 20ml
CBM
CBM
Test kit ALGOL 110 L TC000820
CBM
CBM
Descaler 40 EUROPR40
CBM
CBM
Iron test kit TC000800
CBM
CBM
Solution hardness test kit litered TC000TIT
CBM
CBM
Test kit Kit XS (1-2-3) TC000EXS
CBM
CBM
EUROOXY analysis test kit with strips (25 tests) KITOXYST
CBM
CBM
Joint removal tool