ZOELLER Grinder Pump: Vertical, Three Phase, 2 hp, 230V AC, 45 gpm @ 10' of Head
The ZOELLER Grinder Pump: Vertical (SKU 840-0006, MPN 840-0006) is a general purpose sewage grinder pump with a 2 hp, three-phase, 230V AC motor. It delivers 45 gpm at 10' of head and features a 1 1/4 in FNPT…
SKU 3G-OTH-85004
Also listed as: 8400006 · 840 0006
Local availability & support — the Philippines
- Delivery
- 5–8 business days door-to-door; Bureau of Customs clearance typically 2–4 business days.
- Payment
- Invoicing in PHP or USD. Bank transfer and corporate PO accepted.
- Ships to
- Manila, Quezon City, Cebu, Davao, Batangas
Need installation or engineering help?
Ask a question
Product Description
The ZOELLER Grinder Pump: Vertical (SKU 840-0006, MPN 840-0006) is a general purpose sewage grinder pump with a 2 hp, three-phase, 230V AC motor. It delivers 45 gpm at 10' of head and features a 1 1/4 in FNPT discharge with a vertical orientation. The volute is cast iron, and the pump is not rated for hazardous locations; switch is not included.
Supplied to the Philippines — compatible with 60 Hz installations. DHL Express delivery to Manila, Quezon City, Cebu, customs and duties handled door-to-door.
Frequently Asked Questions
What is a ZOELLER grinder pump used for?
A ZOELLER grinder pump is used in sewage systems to macerate solids and pump wastewater under pressure. It is ideal for commercial or municipal applications where gravity drainage is not possible, handling raw sewage in lift stations or pressure sewer systems.
What are the specifications of the ZOELLER 840-0006 grinder pump?
The ZOELLER 840-0006 is a vertical, three-phase grinder pump with a 2 hp, 230V AC motor. It delivers 45 gpm at 10' of head and has a 1 1/4 in FNPT discharge. The volute is cast iron, and it is not rated for hazardous locations. Switch is not included.
Where to buy a ZOELLER grinder pump worldwide?
3G Electric supplies the ZOELLER grinder pump worldwide. As a global industrial solutions provider, we handle full logistics, customs clearance, and delivery to your site. Contact us for pricing and lead time on this model.
How to install a ZOELLER grinder pump?
Installation of a ZOELLER grinder pump should follow local plumbing and electrical codes. Ensure the pump is securely mounted in a vertical position, the 1 1/4 in FNPT discharge is properly connected, and the 230V AC three-phase power supply is correctly wired. Always consult the manufacturer's manual.
Used in
Common applications for ZOELLERZOELLER Products
3G Electric supplies ZOELLER general purpose sewage grinder pumps. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
