Supco Q113 Electric Sequencer, 2 Switches, 24V AC, 7A @ 240V, 10-30 sec Main On
The Supco Electric Sequencer: 1 Timings (MPN Q113) is a 24V AC sequencer with 2 switches rated at 7 A @ 240V. It features a main on timing range of 10 sec to 30 sec, as specified by the manufacturer.
SKU 3G-OTH-67548
Also listed as: Q 113 · Q-113
Local availability & support — the Philippines
- Delivery
- 5–8 business days door-to-door; Bureau of Customs clearance typically 2–4 business days.
- Payment
- Invoicing in PHP or USD. Bank transfer and corporate PO accepted.
- Ships to
- Manila, Quezon City, Cebu, Davao, Batangas
Need installation or engineering help?
Ask a question
Product Description
The Supco Electric Sequencer: 1 Timings (MPN Q113) is a 24V AC sequencer with 2 switches rated at 7 A @ 240V. It features a main on timing range of 10 sec to 30 sec, as specified by the manufacturer.
Supplied to the Philippines — compatible with 60 Hz installations. DHL Express delivery to Manila, Quezon City, Cebu, customs and duties handled door-to-door.
Frequently Asked Questions
What is the Supco Q113 electric sequencer used for?
The Supco Q113 electric sequencer is used in HVAC and refrigeration systems to stage electric heating elements or other loads in a timed sequence. It ensures that multiple circuits energize one after another, preventing large inrush currents and protecting system components.
What are the specifications of the Supco Q113 sequencer?
The Supco Q113 sequencer operates on 24V AC and has 2 switches rated at 7 A @ 240V. Its main-on timing range is 10 sec to 30 sec. This model is designed for precise staging control in heating and cooling equipment.
Where to buy the Supco Q113 sequencer worldwide?
3G Electric supplies the Supco Q113 sequencer to customers worldwide. We handle full logistics, customs clearance, and delivery to your site. Contact us for a quote and lead time; we source genuine Supco parts for global industrial and HVAC applications.
How to install the Supco Q113 electric sequencer?
Install the Supco Q113 sequencer by mounting it securely in the control panel, connecting the 24V AC control voltage to the coil terminals, and wiring the load circuits through the normally open switch contacts. Follow the manufacturer's wiring diagram and ensure all connections are torqued to specification.
Used in
Common applications for SupcoSupco Products
3G Electric supplies Supco sequencers. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
