SIGNODE Assembly,Idler 2 Gears: For AMPT-58
The SIGNODE Assembly, Idler 2 Gears (MPN 023516) is a material handling part designed for use with the SIGNODE AMPT-58 model. This assembly fits SIGNODE brand equipment and is identified by SKU 023516.
SKU 3G-OTH-340009
Local availability & support — the Philippines
- Delivery
- 5–8 business days door-to-door; Bureau of Customs clearance typically 2–4 business days.
- Payment
- Invoicing in PHP or USD. Bank transfer and corporate PO accepted.
- Ships to
- Manila, Quezon City, Cebu, Davao, Batangas
Need installation or engineering help?
Ask a question
Product Description
The SIGNODE Assembly, Idler 2 Gears (MPN 023516) is a material handling part designed for use with the SIGNODE AMPT-58 model. This assembly fits SIGNODE brand equipment and is identified by SKU 023516.
Supplied to the Philippines — compatible with 60 Hz installations. DHL Express delivery to Manila, Quezon City, Cebu, customs and duties handled door-to-door.
Frequently Asked Questions
What is the SIGNODE Assembly, Idler 2 Gears used for?
The SIGNODE Assembly, Idler 2 Gears (MPN 023516) is a material handling part used in strapping or packaging equipment. It is designed for the SIGNODE AMPT-58 model to drive or guide strapping material, ensuring smooth operation in industrial packaging lines.
What are the specifications of the SIGNODE Assembly, Idler 2 Gears?
This assembly is a SIGNODE-branded part (MPN 023516) for use with the SIGNODE AMPT-58 model. It is classified as an Assembly, Idler 2 Gears and fits SIGNODE equipment. The SKU is 3G-OTH-340009. It is a material handling component for strapping systems.
Where to buy the SIGNODE Assembly, Idler 2 Gears worldwide?
3G Electric supplies the SIGNODE Assembly, Idler 2 Gears (MPN 023516) worldwide. As a global industrial distributor since 1990, we handle full logistics, customs clearance, and delivery to your location. Contact us to source this SIGNODE part for your AMPT-58 equipment.
How to install the SIGNODE Assembly, Idler 2 Gears?
Installation of the SIGNODE Assembly, Idler 2 Gears should follow the AMPT-58 service manual. Typically, it involves removing the old idler assembly, aligning the new gears with the drive mechanism, and securing it with the correct fasteners. Use proper lockout/tagout procedures before servicing.
Used in
Common applications for SIGNODESIGNODE Products
3G Electric supplies SIGNODE material handling parts. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
