HARRINGTON Bottom Hook Assembly: Electric Chain Hoists, 20,000 lb Compatible Load Capacity
The HARRINGTON Bottom Hook Assembly (MPN ER2IS1121) is a bottom hook assembly designed for use with ER2 series electric chain hoists. It includes a safety latch and is compatible with a 20,000 lb load capacity. This…
SKU 3G-OTH-330888
Local availability & support — the Philippines
- Delivery
- 5–8 business days door-to-door; Bureau of Customs clearance typically 2–4 business days.
- Payment
- Invoicing in PHP or USD. Bank transfer and corporate PO accepted.
- Ships to
- Manila, Quezon City, Cebu, Davao, Batangas
Need installation or engineering help?
Ask a question
Product Description
The HARRINGTON Bottom Hook Assembly (MPN ER2IS1121) is a bottom hook assembly designed for use with ER2 series electric chain hoists. It includes a safety latch and is compatible with a 20,000 lb load capacity. This component is a direct replacement part for HARRINGTON ER2 and NER2 hoists.
Supplied to the Philippines — compatible with 60 Hz installations. DHL Express delivery to Manila, Quezon City, Cebu, customs and duties handled door-to-door.
Frequently Asked Questions
What is the HARRINGTON Bottom Hook Assembly used for?
The HARRINGTON Bottom Hook Assembly (MPN ER2IS1121) is a replacement component for ER2 and NER2 series electric chain hoists. It supports a 20,000 lb load capacity and includes a safety latch. This assembly is used in industrial lifting applications to securely attach loads to the hoist chain.
What are the specifications of the HARRINGTON Bottom Hook Assembly?
The HARRINGTON Bottom Hook Assembly (MPN ER2IS1121) is a bottom hook assembly for electric chain hoists. It is compatible with the ER2 series and supports a 20,000 lb load capacity. Included components are a safety latch. It is a direct replacement part for HARRINGTON ER2 and NER2 hoists.
Where to buy the HARRINGTON Bottom Hook Assembly worldwide?
You can source the HARRINGTON Bottom Hook Assembly (MPN ER2IS1121) from 3G Electric, a global industrial equipment distributor. We handle full logistics, customs clearance, and delivery to worldwide locations. Contact us for availability and lead time on this HARRINGTON replacement part.
How to install the HARRINGTON Bottom Hook Assembly?
To install the HARRINGTON Bottom Hook Assembly (MPN ER2IS1121), first ensure the hoist is de-energized and the load is removed. Attach the assembly to the hoist chain using the provided safety latch. Follow the manufacturer's manual for torque specifications and verify proper engagement before operation.
Used in
Common applications for HARRINGTONHARRINGTON Products
3G Electric supplies HARRINGTON bottom hooks for hoists. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
