FLUKE Replacement Bladhead: Terminate/Cut, JR-LEV-1
The FLUKE Replacement Bladehead (SKU JR-LEV-1-H, MPN JR-LEV-1-H) is a blade head for punchdown tools, designed for terminate/cut operations. It is compatible with Leviton jacks, including models 41106, 41108, and 5G108.
SKU 3G-OTH-274786
Also listed as: JRLEV1H · JR LEV 1 H
Local availability & support — the Philippines
- Delivery
- 5–8 business days door-to-door; Bureau of Customs clearance typically 2–4 business days.
- Payment
- Invoicing in PHP or USD. Bank transfer and corporate PO accepted.
- Ships to
- Manila, Quezon City, Cebu, Davao, Batangas
Need installation or engineering help?
Ask a question
Product Description
The FLUKE Replacement Bladehead (SKU JR-LEV-1-H, MPN JR-LEV-1-H) is a blade head for punchdown tools, designed for terminate/cut operations. It is compatible with Leviton jacks, including models 41106, 41108, and 5G108.
Supplied to the Philippines — compatible with 60 Hz installations. DHL Express delivery to Manila, Quezon City, Cebu, customs and duties handled door-to-door.
Frequently Asked Questions
What is the FLUKE JR-LEV-1-H replacement bladehead used for?
The FLUKE JR-LEV-1-H replacement bladehead is used for terminate/cut operations on punchdown tools. It is specifically designed for Leviton jacks, including models 41106, 41108, and 5G108, making it essential for network cabling and telecommunications installations.
What are the specifications of the FLUKE JR-LEV-1-H bladehead?
The FLUKE JR-LEV-1-H is a replacement bladehead (type JR-LEV-1) for punchdown tools. It supports terminate/cut functions and is compatible with Leviton jacks 41106, 41108, and 5G108. The manufacturer part number is JR-LEV-1-H, and it is produced by FLUKE.
Where to buy the FLUKE JR-LEV-1-H replacement bladehead worldwide?
You can source the FLUKE JR-LEV-1-H replacement bladehead worldwide through 3G Electric. As a global industrial equipment distributor since 1990, 3G Electric handles full logistics, customs clearance, and delivery to any location, ensuring a smooth procurement process for this FLUKE bladehead.
How to install the FLUKE JR-LEV-1-H bladehead on a punchdown tool?
To install the FLUKE JR-LEV-1-H bladehead, first ensure the punchdown tool is unpowered. Remove the existing bladehead by releasing the retaining mechanism, then align the JR-LEV-1-H with the tool's slot and press firmly until it clicks into place. Always follow the tool manufacturer's instructions for safe installation.
Used in
Common applications for FLUKEFLUKE Products
3G Electric supplies FLUKE replacement bladeheads for punchdown tools. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
