OEM APPROVED VENDOR Electric Sequencer
The APPROVED VENDOR Electric Sequencer: 1 Timings (SKU 3G-OTH-67469) is a sequencer with 2 switches, operating at 24V AC. It features a main-on timing range of 1 sec to 20 sec and is rated at 10 A @ 120V and 7 A @ 240V.
SKU 3G-OTH-67469
Local availability & support — the Philippines
- Delivery
- 5–8 business days door-to-door; Bureau of Customs clearance typically 2–4 business days.
- Payment
- Invoicing in PHP or USD. Bank transfer and corporate PO accepted.
- Ships to
- Manila, Quezon City, Cebu, Davao, Batangas
Need installation or engineering help?
Ask a question
Product Description
The APPROVED VENDOR Electric Sequencer: 1 Timings (SKU 3G-OTH-67469) is a sequencer with 2 switches, operating at 24V AC. It features a main-on timing range of 1 sec to 20 sec and is rated at 10 A @ 120V and 7 A @ 240V.
Supplied to the Philippines — compatible with 60 Hz installations. DHL Express delivery to Manila, Quezon City, Cebu, customs and duties handled door-to-door.
Frequently Asked Questions
What is an APPROVED VENDOR electric sequencer used for?
An electric sequencer like the APPROVED VENDOR is used in industrial control panels to stage loads such as heating elements or compressors. It delays the activation of each switch in sequence, preventing simultaneous inrush current and reducing electrical stress on the system.
What are the specifications of the APPROVED VENDOR sequencer?
The APPROVED VENDOR sequencer operates at 24V AC with 2 switches. It has a main-on timing range of 1 sec to 20 sec and is rated at 10 A @ 120V and 7 A @ 240V. This model is designed for precise staging in HVAC and industrial equipment.
Where to buy the APPROVED VENDOR sequencer worldwide?
3G Electric supplies the APPROVED VENDOR sequencer to customers worldwide. As a global industrial solutions provider, we handle full logistics and customs clearance to deliver this sequencer to your facility, ensuring compliance with international shipping requirements.
How to install an APPROVED VENDOR electric sequencer?
Install the APPROVED VENDOR sequencer by mounting it in a clean, dry control panel and connecting the 24V AC supply to the input terminals. Wire each switch output to the corresponding load. Set the main-on timing via the onboard adjustment to match your staging sequence requirements.
OEM Products
3G Electric supplies OEM sequencers. We supply genuine products with in-stock availability on common SKUs, technical documentation, commissioning support, and warranty service — worldwide.
